New release Apr 28
Contractor visit readiness

Drama-free contractor visits, every time.

Samnord brings together work definition, supplier coordination, worker readiness, and risk assessment — so every contractor visit is prepared before the first shovel hits the ground.

Grindklareringar

+25%

184

MånTisOnsTorFreLörSön

Besök denna vecka

Mot förra veckan

47

+29%

Aktiva besök

+16%
AE
AB Elinstallatör
Underhåll
08:30
NL
Nordic Lyft AB
Installation
10:15
SV
Svensk Ventilation
Service
13:00
PS
PowerTech Service
Inspektion
15:30

Beredskap

Idag

92%
Klara
JA EL MO +4
How contractor work is handled today

Too many handoffs. Too little safety.

Contractor visits are often coordinated over email, Excel, PDFs, phone calls, and last-minute checks on site. The result is predictable: unclear scope, uneven readiness, and missing evidence when something needs to be traced afterwards.

Typisk koordinering · 7 dgr innan
Just nu
E-post 14:22
Från: Stefan Bergström
Re: Fwd: Re: SKA-intyget?
"Har vi den senaste? Stefan har nya grabbar med sig på tisdag…"
X
Besök_v17_FINAL.xlsx igår
A
B
C
1
Leverantör
Datum
OK
2
AB Elinst.
14/3
3
Nordic Lyft
??
NEJ
4
Sv. Vent.
15/3
OK
PDF
Checklista_2023.pdf
Sida 3 av 24 Inskannad
"Underskrift oläslig. Vem då?"
SMS · Janne 06:42
Hej — kommer 30 min sen.
Ny arbetare med. Namn: Janne
Telefon Missat
Leverantör — okänt nr.
2 min sen · riskbedömning ej gjord
Sound familiar?

The symptoms that show up every week.

Late starts

Visits start late when documentation is missing at the gate.

Catch-up admin

Hours spent assembling paperwork after the visit.

Broken trails

Complete records are missing when something needs review.

Scattered coordination

Email, calls, Excel, PDFs — all in the same week.

One connected flow

From planning to start on site.

Samnord brings work definition, supplier coordination, worker readiness, and on-site risk assessment into a shared process. Everyone knows what work is happening, what needs to be ready before arrival, and what was documented on site.

Planning

A shared work definition

Define scope, risks, and requirements once. The supplier sees exactly the same picture — no version mismatches.

Ventilation — Hall B
Återkommande · kvartalsservice
DELAD
Omfång Service + filterbyte
Zon B-halls tak · 7 m
Krav Heta arbeten · fall
Heta arbeten Fallskydd SSG · giltig
Readiness

Workers ready before arrival

Every worker completes induction, attests credentials, and signs digitally — before they set foot on site.

Beredskap · 3 arbetare
Norrlands El AB
3 / 3
JL Janne Lindström 07:12
Sara Öberg 06:48
MR Mikael Rehn IGÅR
Introduktion 100%
Risk assessment

On-site risk assessment

A short, clear check when work is about to start. Signature, timestamp, location-bound — the trail forms automatically.

Riskbedömning
28 apr · 08:04 · Sektion 2
PÅGÅR
Identitet verifierad
Riskbedömning genomgången
Skyddsutrustning bekräftad
Underskrift av arbetsledare VÄNTAR
SIGN · 08:04 · SEKTION 2
Cleared to enter

You see who's ready — and who isn't.

Two checkpoints, not one. Before arrival, training and induction are confirmed. At the gate, PPE, signatures, and risk steps are recorded. Everything logged per worker — not per supplier.

Calendar
Maj 2026
Month Week
Mån
Tis
Ons
Tor
Fre
Lör
Sön
27
28
29
30
1
08:00 #26-0000001
2
08:00 Västkusten
3
4
5
07:30 AB Elinst.
6
7
8
09:00 Nordic Lyft
9
10
11
12
13
13:00 Norrlands El
14
10:15 Sv. Vent.
15
16
17
18
19
20
21
13:00 PowerTech
22
23
24
25
26
08:00 AB Elinst.
27
28
29
15:30 Sv. Vent.
30
31
Leverantörsbesök
Återkommande
Detaljer Tilldelningar Riskbedömning
Order #26-0000074 Bekräftad
Västkusten Tak & Fasad AB
2 maj · 08:00 – 13:55
Pre-visit
Utbildning genomförd
4 / 6
Allmän introduktion
Anna Lindqvist
Klar
Heta arbeten
Anna Lindqvist
Ej klar
Fallskydd
Erik Johansson
Klar
On-site
Kontroll vid grinden
2 / 3
PPE-kontroll
Anna Lindqvist
Riskmoment genomgånget
Anna Lindqvist
Arbetsledarens signatur
Erik Johansson
The features, in five steps

Five steps, one flow.

How Samnord works — from first work definition to approved start.

01 / 05 Planning

Define the work — once

Capture work tasks, steps, and safety requirements together. The supplier sees exactly the same picture — no version juggling, no email attachments.

  • Reuse templates for recurring work
  • Tie requirements to each step
  • Version history included
Arbetsorder · utkast

Ventilation — Hall B

Kvartalsservice · återkommande

DELAD

Säkerhetskrav

LOTO Skyddsutrustning kat. 2 Ljusbågsskydd Bevakare krävs

Arbetssteg

  1. 1

    Granska installationsdokumentation

  2. 2

    Koppla bort och lås kretsar som ska testas

  3. 3

    Inspektera fördelningscentraler och kablage

  4. 4

    Testa jordfelsbrytare

  5. 5

    Funktionstest av nödbelysning


Beräknad totaltid

4h 5m

Leverantörer

4 organisationer i flödet

AE

AB Elinstallatör

556234-9921

Senast · igår

Aktiv
NL

Nordic Lyft AB

556891-0023

Senast · 2d

Aktiv
SV

Svensk Ventilation

559012-3310

Påbörjad · 4d

Utkast
PS

PowerTech Service

556712-8810

Väntar på svar · 2d

Inbjudan skickad
02 / 05 Supplier

Bring the supplier into the same flow

Supplier organisations work in the same shared context — without buying extra tools or learning a new system.

  • No separate licence for the supplier
  • Shared work definition in real time
  • Status syncs both ways
03 / 05 Coordination

Send proposal, get confirmation

Create work order proposals, agree on scope and book the job — all on the same page, no email threads.

  • Accept/decline in one click
  • Scheduled reminder ahead of the visit
  • Changes logged automatically

Förslag på arbetsorder

#26-0000001

Väntar på leverantör

Leverantör

AB Elinstallatör

556234-9921

Plats

Västerås Plant B

Sektion 2 · Hall B


Schema

Start

28 apr · 08:00

Längd

4h 5m

Frekvens

Engångs


JA

Jens Andersson

Eltekniker · AB Elinstallatör

3/4

Klart


Innan ankomst

Platsintroduktion

Klar · 12 min

Klart

Behörighet verifierad

SSG · giltig t.o.m. 2027

Klart

Digital underskrift

Signerad 06:48

Klart

Riskbedömning (på plats)

Imorgon · 08:00

Väntar
04 / 05 Readiness

Workers ready before arrival

Assigned workers complete induction, attest credentials, and sign digitally — well before work starts.

  • Site induction on the worker's phone
  • Credentials verified automatically
  • Digital signature with timestamp
05 / 05 Risk assessment

An event-based risk assessment on site

A short risk check just before work starts. Signature, timestamp, location-bound — and the audit trail forms without extra paperwork.

  • Location-bound signature via phone
  • Interruptions and events captured directly
  • PDF/audit trail in one click
Live · 28 apr · 08:04

Riskbedömning · Sektion 2

Händelsebaserad — innan arbetet startar

Klar för start

Avstämning

Identitet verifierad

QR-scan · 08:02

Behörighet och utbildning

SSG · giltig

Skyddsutrustning bekräftad

Foto bifogat

Säkerhetsåtgärder bekräftade

Arbetsledare · Mia N.


MN

Signerad · Mia Nilsson

When things don't go to plan

The exceptions every site recognises.

Late arrival

The advance notice updates automatically and affected parties get the new ETA.

Last-minute new worker

The added person must pass the same checks as the team — otherwise no entry.

Expired certificate

Expiry dates are flagged before arrival — no certificate, no clearance.

Changed scope

Changes require re-confirmation; the risk assessment updates automatically.

Built for both sides

Bring suppliers into the same flow — without another tool they resent.

Suppliers get clear expectations, visit context, and a live view of which workers are ready. You get one system of record instead of email threads.

  • No supplier license fees — invited into the workflow.
  • Who's ready and who's missing something — visible to both sides.
  • Scope changes land in one place, not a threaded reply.
  • Access scoped to the visits that concern them.
AE
AB Elinstallatör
Supplier view · samnord.com
3 active visits
Västerås · Plant B
Mar 14 · 08:00
3 workers
Ready
Göteborg · Logistics hub
Mar 18 · 06:30
2 workers
Prep
Malmö · Plant A
Mar 22 · 10:00
4 workers
Prep
Evidence trail
Visit #4821 · Cable routing
  1. 08:42
    Scope sign-off by supplier
    Jens Andersson · AB Elinstallatör
  2. 09:05
    Worker induction completed
    3 of 3 workers
  3. 09:41
    LOTO assessment passed
    Score 10/10 · Signed
  4. 10:02
    Risk assessment cleared
    Site safety lead · Mia Nilsson
  5. 16:18
    Visit closed
    Clean handover · Photo attached
Evidence, right-sized

A defensible safety trail — without enterprise weight.

Every handoff, induction, and on-site check is logged against the visit. Nothing to reconstruct from email if something goes wrong.

  • Automatic timeline, not a folder of PDFs.
  • Scope and scope-changes captured in place.
  • Evidence scoped to the visit it belongs to.
  • Export for audits, insurance, or reviews in one click.
Who it's for

Built for teams coordinating external work.

Samnord is built for Swedish industrial sites with recurring contractor visits — operations managers, site leads, safety leads, and coordinators — and just as much for the supplier side, because getting everyone ready before the gate takes both.

Operations manager

Needs the visit running without trouble in the morning.

Site
Site lead

Responsible for the right work happening at the right place, right time.

Site
Safety lead

Wants a trail that holds up when it's asked for.

Site
Contractor coordinator

Juggling 20 suppliers and wants to see who's ready.

Site
Supplier supervisor

Wants clear expectations — not another portal account.

Supplier
Contractor on site

Has done the induction. Knows where to go, what to do.

Supplier
FAQ

Questions we hear often.

Is this an EHS platform?
No. Samnord covers contractor visit readiness end to end. It's not a replacement for broader EHS systems and doesn't try to be.
Do our suppliers need to buy anything?
No. Suppliers are invited into the workflow and get the context they need to prepare their workers.
How long does it take to get started?
A pilot customer can be onboarded without custom engineering. You define your sites, work, and safety requirements, and invite your first supplier.
Is it available in Swedish?
Yes. Samnord is built for Swedish industrial sites, in Swedish and English.
Does Samnord integrate with SSG, ID06, or other systems?
Not yet. As early partners, our first customers shape which integrations get built first — SSG, ID06, gate systems, calendars and the like. Tell us what you need to connect to, and it becomes part of the conversation.
What about internal SAM, incidents, and competence management?
Those are on the roadmap. The product is deliberately focused on contractor visit readiness first.
On the day

The day of the visit is boring, in the best way.

Operational clarity before anyone shows up. No surprises, no scramble when work starts.